| ⇦ |
| ⇨ |
Work of 3.0×10⁻⁴ joule is required to be done in increasing the size of a soap film from 10cm x 6cm to 10cm x 11cm. The surface tension of the film is
Options
(a) 5 x10⁻² N/m
(b) 3 x10⁻² N/m
(c) 1.5 x10⁻² N/m
(d) 1.2 x10⁻² N/m
Correct Answer:
3 x10⁻² N/m
Explanation:
Surface tension, S = work done/increase in area
As the soap film has two surfaces.
S = (3.0 x 10⁻⁴ J)/[2 x (10 x 11 – 10 x 6 ) x 10⁻⁴ m²]
= 3 x 10⁻² N/m.
Related Questions: - A ball is dropped from a height of 20 cm. Ball rebounds to a height of 10cm
- Length of second pendulum is
- Pick out the statement ehich is incorrect?
- A radioactive substance has a half-life of four months. Three-fourth of substance
- A vibration magnetometer placed in magnetic meridian has a small bar magnet
Topics: Properties of Bulk Matter
(130)
Subject: Physics
(2479)
Important MCQs Based on Medical Entrance Examinations To Improve Your NEET Score
- A ball is dropped from a height of 20 cm. Ball rebounds to a height of 10cm
- Length of second pendulum is
- Pick out the statement ehich is incorrect?
- A radioactive substance has a half-life of four months. Three-fourth of substance
- A vibration magnetometer placed in magnetic meridian has a small bar magnet
Topics: Properties of Bulk Matter (130)
Subject: Physics (2479)
Important MCQs Based on Medical Entrance Examinations To Improve Your NEET Score
18000+ students are using NEETLab to improve their score. What about you?
Solve Previous Year MCQs, Mock Tests, Topicwise Practice Tests, Identify Weak Topics, Formula Flash cards and much more is available in NEETLab Android App to improve your NEET score.
Share this page with your friends

Leave a Reply